Project name: in dagang oilfield

Location: tianjin dagang oil field

Time: in February 2014

Construction unit: Beijing Hongyuan Kate M&E Co., Ltd.(Group subsidiary)


In February 2014, we were awarded the overhaul project of Dagang Oil Field Co., Ltd. and Marine Engineering Co., Ltd. Two Caterpillar 3406, one Caterpillar 3508B, three Caterpillar 3516B and four Caterpillar 3516A required overhaul and the overhauling work was to be finished in 2 months. Higher requirements were made due to tight time schedule and difficulties in maintenance.

The staff at Dagang Repair Shop worked overtime with no complaints at the forefront of the offshore platform of Marine Engineering Co., Ltd., and presented their full enthusiasm for work through practical actions and finally completed the overhaul tasks on time with quality assured. The quality inspections conducted by both parties showed that all performance indices were superior to the requirements of Marine Engineering Co., Ltd. The project was handover to Dagang Oil Field Co., Ltd. and Marine Engineering Co., Ltd. on time. The Project won us a good reputation from Dagang Oil Field and obtained uniform appraisal from the leaders of Marine Engineering Co., Ltd.

        大概.png